Northern Connector SA

Principal Builder – Lendlease

Contract duration – 12 months (still in progress)

Contract value - $2mil

 

Being involved in the project while still in design stage ensured Portolesi Structural could create the most appropriate sealing system for the project.  The project, which consists of 141,000m of saw-cut control joints in the 14km of concrete roadway required a very different application system to maintain the low noise surface required.  While concrete roads are common, significant sealant failure has plagued the process as often, this sealing is either self completed by the head contractor or by companies not experienced in this type of work.  As a specialised contractor of caulking work, Portolesi Structural were able to determine where failures on other projects would be expected and then modify the installation process to ensure that these fail points were eliminated.   

The projects is still in its construction phase but to date the sealant is 95% and a failure rate of 0% has been achieved while still maintaining the construction program

309

Theme picker